Project Management

IGC makes strenuous efforts to successfully transfer its total essential experience, ability and creativity into actual plants.
Bearing in mind tight and well conceived engineering that avoid costly and unnecessary frills, cost cutting design features and construction on or ahead of schedule, our project managers direct and coordinate the activities of various departments so as to accomplish each job in the most efficient and economical manner. The procedure is as follows:
Project Information And Proposal
- Client’s request for proposal
- Survey & planning of proposal
- Basic Engineering for Proposal
- Cost Estimation
- Contract Terms and Conditions
- Project Execution Procedures
- Pre-qualification
- Preparation and submission of proposal
- Contract
Project Control
- Detailed Schedule
- Budget Control
- Cost Control
- Progress Control
- Administration
- Coordinating the Engineering, Procurement and Construction
- Work Completion, Acceptance and issuing records
Project Engineering
1. Basic
- Master Plan for Project execution
- Documentation of Basic information
- Plot Plan
- Detailed Engineering data
- Specifications
- Piping and instrument diagram
- Utility diagram
2. Detailed Design
- Bill of Material
- Detailed Mechanical design and drafting
- Supporting documents for purchase order, requisition
- Construction drawing and others
- Checking Vendor’s fabrication drawings
- Operating Manual
- Equipment Manual
Procurement
- Inquiry to vendors
- Analysis of Quotations
- Purchase order for equipment and Materials
- Inspection and expediting vendor supplies
- Shop fabrication
- Transportation and Traffic Control
Construction
1. Construction Planning
- Planning and scheduling
- Fabrication Drawing
- Specification
- Technical Supervision
- Field Administration
- Material Control
- Safety Control
- Quality Control
- Manpower Recruiting And Control
- Construction Equipment Control
- Local Purchasing
- Subcontractor Selection And Control
- Insurance Handling
- Regular Reporting To Client
2. Temporary Construction Work
3. Civil work
- Site preparation and general civil works
- Process foundations
4. Architectural work
5. Mechanical work
- Structure
- Equipment erection
- Piping
- Electrical and Instrument
- Insulation and painting work
- Pre-commissioning
Start-Up, Plant Operation and Training
- Start -up
- Preparation of Operating Manual
- Training of operating personnel
- Operation and maintenance
Introduction
Project
Organization Chart
Construction Equipment
Quality Control and Quality Assurance System (QA & QC)
Health , Safety and environment protection (HSE)